Product range

Winches and line tools

Built for tower erection, stringing of low and medium voltage overhead lines, underground cabling and general lifting work. Every machine can be customised to a client's requirement.

Also manufactured

Specifications on request

We build these to order and are happy to send drawings and full specifications. Tell us the capacity and the application and we will send the right sheet.

    Safety

    Why every BMC winch has a negative brake

    A negative brake will not allow the load to come down until the automatic brake is released. On a tower erection job, that is the difference between a controlled lift and a dropped one.

    Our 5 ton machines also carry an automatic safety clamp and a grooved shaft that stops the steel wire rope overlapping on the capstan. These are not options — they are fitted as standard, because the machine is replacing a practice the industry should have stopped years ago: using agricultural tractors to erect transmission towers.

    A BMC Power winch anchored to the test bench during a load test
    Load testing on our own bench. Every winch is pulled to a safe load of five tons before it is supplied.
    WhatsApp